1
/
of
0
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Dog Tie Out Cable for Outside,50FT Heavy Duty Dog Leash&Chains with Swivel Hook,Small-Large Dogs Runner Cable for Dogs Up to 250lbs, Long Lead Line for Yard Outdoor and Camping (250lbs 50FT, Green)
Regular price
$53.90 USD
Regular price
Sale price
$53.90 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Reflective Dog Tie Out Cable: 50ft long dog tie out cable, high strength tested for small-large dogs up to 250lbs. Our dog runner cables&leashes are the top choice for free-running dogs in outside, yard or camping, providing more room for running or training and play.
- Heavy Duty Durable Clip: This outside dog leads&chains with 360° free rotation sturdy clasp, lightweight, durable and rust-proof. The ends of the dog tie out cable will be easily attached to a spiral ground stake, tree trunk or fence. The twist lock does not tangle the cable and is used to keep pets safe outdoors.
- Chew Proof Dog Leash: Dog tie out cable are made of strong steel wire rope and soft transparent pvc, which are anti-chew and rust-proof. The clip with safety lock allows the dog runner cable to be used in a variety of situations and also as a training leash for dogs.
- More Size and Color Options: 10/15/20/30/50 feet dog lead line, builds up quickly on a stake, giving your dog more room to roam. Your dog loves the outdoors and can use it in camping, parks, yards or the beach.
- Dog Cable for Pet Lovers: Dog tie out cable system creates a safe area that allows your dogs to come and go freely while preventing them being distracted and escaping from the camp,yard. This is a good gifts for dog lovers. If you encounter any quality problems with our products, please feel free to contact us, we will solve the problem for you in time.
Overview
- Size : 250lbs 50FT
- Color : Green
- Brand : Evilplan
- Material : Alloy Steel
- Product Dimensions : 600"L x 0.2"W